my creation…. LIIIIIIVESSSSS!

Both racks are up and running; the rig is fully operational. I’ve begun using it a bit for Freakwitch production, and everything is playing nicely together now.

The computer rack is great. I have a fantastic computer case, and 2 LCD widescreen monitors (20″). This is by far more screen real estate than I’ve ever had. It’s a treat doing audio work with this much space! I also have quite a bit of hard drive space, including space for backups.

Presently I am using WindowsXP and Sonar for my DAW, Sonar is great software that runs on a horrid operating system. I do plan to investigate audio production tools for Linux, most likely I’ll install Ubuntu-Studio (a version of Linux that is customized for multimedia production, which runs the Ardour DAW among many other things) on a spare partition and give it a try.

Anyway, I have 16 ins and outs, 16 mic pres, and a whole bunch of microphones. I just traced down the last wiring problem tonight (one of the channels wasn’t working…. turns out it wasn’t wired up correctly. All fixed).

Also, I got a chance to fire up my new Weller soldering iron. In testing the mic preamps, I discovered that one of my dynamic microphones wasn’t working correctly. No output at all. So I took it apart, poked around a bit, and discovered it was intermittent. Sometimes it worked, sometimes it didn’t. Did a little more investigation and found a cold solder joint on one of the wires connected to the XLR output jack. All fixed.

So the rig is fully operational now, but it is not yet portable as I still have to finish building the lids. Given that this is a holiday week, that it is supposed to precipitate for the remainder of the week, and that I don’t presently have enough carpeting, I doubt I’ll get the lids finished this week.

But in the meantime, the rig is in my living room, up and running so that I can work on music production. I’m rediscovering the joys of drum programming and audio editing, it’s been a few months since I’ve done much of this. I’m very happy to have this rig available to me at a moments notice.

I’ll post some photos soon….

inching toward completeness

Still working on the rigs every chance I get. The weather hasn’t been as cooperative as I’d perhaps like, but I’m still making progress.

The drawer for the headphone mixer is now installed in the analog audio rack, and I have the computer rebuilt inside the new rack-mount case. The new monitors rock, lots of good screen real estate, much more than I’m used to.

Weather permitting, I should make tracks (pun intended) on carpeting the computer rack tomorrow; once that’s done I need to build the lids and then I’ll be pretty much done.

More pics soon….

audio rack almost done

I have the audio rack nearly complete. The carpeting has been installed, as have the mixer and the preamps for the mobile rig. Still missing is a drawer that will contain the headphone mixer, I need to shave about 1/16″ off of it so it fits in better. It will go just below the mixer, and above where the preamp/compressor rack is. Tomorrow I should finish the drawer, and get started on the computer rack (identical to this but containing the computer rig), carpeting the front and rear panels, and building the lids. Lots of work ahead but good progress is being made, as you can see!

100_1802_jpg.jpeg

100_1803_jpg.jpeg

nice pair of racks!

I’m well into construction for the portable racks. These are turning out larger than anticipated, large enough in fact that they won’t fit into my car! Not good. But, I think a small cargo trailer is the best solution, and seems like a workable compromise.

Here are the pics…. One is further along than the other, the right on has the sides and the removable front and back panels done. These racks will ultimately be painted black and then covered with black carpet.

100_1769_jpg.jpeg

This is hopefully what the view from above will look like…. a mixer in the top of one rack, and 2 – 20″ LCD monitors stacked in the other.

100_1767_jpg.jpeg

A side view.

100_1766_jpg.jpeg

Back view. The one on the left has the sides and the removeable rear panel in place.

100_1765_jpg.jpeg

The view with the rear panel removed, leaning up against the rack.

100_1764_jpg.jpeg

The front panel installed.

100_1763_jpg.jpeg

The front panel removed and leaning against the rack.

100_1762_jpg.jpeg

For size reference, this is my beautiful 10 year old daughter posing.

100_1761_jpg.jpeg

The 2 racks. Indeed, a luscious pair!

100_1760_jpg.jpeg

Nice pair of racks, coming right at you…

construction begins

The parts are starting to show up here, and I have some lumber. Looks like I’ll be rack-building starting tomorrow. I hope to have the rig up and running by the end of the week, but we’ll see how it goes. I plan to take some photos…

ze gear, she is comink….

Having secured financing for the mobile rig, I have now ordered the parts I need to build it. Everything should be here within a week or two, and then another week or so to build the racks.

This means Crafted Recordings should be open for business by the end of October. Watch this space.

one step closer….

Just wanted to update, things are still rolling along. I just made arrangements for the financing I need to finish the mobile rig and launch the business. I should be acquiring the rest of the gear/materials I need and getting the mobile racks built within the next 2 weeks.

More details will be forthcoming, but the exciting news is Crafted Recordings is one step closer to launch….

Site coming together

The site is coming together. This business is not ready to roll just yet; things are in preparation. I have a sweet mobile recording rig in mind; I already have much of the hardware for it, but I definitely need to acquire some more to get it ready. So while the geek in me works on that, the rest of me has to begin thinking about the business end of this endeavor.

Ultimately, I’ve loved recording music for more than 20 years now. I think I want to make it a bigger part of my life than it already is. Keep watching this space to see how things evolve.